Lean and Toyota Production System

136 terms in the Manufacturing glossary, each with its one-line definition.

136 terms, A to Z

  • 5 Whys Problem solving method that asks why a problem happened, then why again about each answer, until it reaches a root cause the team can fix.
  • 5S Workplace organization method of sort, set in order, shine, standardize and sustain that gives everything a place and makes problems easy to see.
  • A3 Report One page document on A3 paper that tells the full story of a problem, its root cause, countermeasures and follow up, used for coaching and review.
  • Abnormality Management Practice of defining normal conditions clearly so any deviation stands out at once and triggers a fast, defined response and escalation.
  • Andon Signal of lights, sounds or a board that shows line status and lets an operator call for help the moment something goes wrong.
  • Batch and Queue Traditional way of producing in large lots that then wait in piles before the next step, creating inventory, delay and hidden defects.
  • Bowling Chart Table tracking a few key metrics month by month against target, with each cell colored green when met and red when missed.
  • Built-in Quality Principle that each operator and process makes sure work is right before passing it on, instead of relying on inspection at the end of the line.
  • Catchball Back and forth dialog that passes goals and plans between levels of a company until each level agrees on the part it will own.
  • Cellular Manufacturing Grouping all the machines needed for a family of similar products into a compact cell, often U shaped, so parts move straight from step to step.
  • Chaku-Chaku Cell where machines unload parts automatically so the operator only walks the loop loading each part into the next machine.
  • Chief Engineer Single leader who owns a whole product from concept and customer value to cost, launch and profit, leading through expertise more than authority.
  • Coaching Kata Daily coaching routine of five standard questions that a coach uses to teach the improvement kata and build the learner's problem solving skill.
  • Constant Work in Process CONWIP Pull control method that caps the total work allowed inside a line and releases a new job only when a finished one leaves.
  • Continuous Flow Making and moving products one at a time, or in tiny consistent batches, through each step with no waiting piles in between.
  • Cost Deployment World Class Manufacturing method that converts every plant loss into money, traces it to its cause and ranks improvement projects by payoff.
  • Countermeasure Action taken against the root cause of a problem, treated as the best current attempt that must be checked and may later be improved.
  • Current State Map First value stream map, drawn by walking the process, showing how material and information really flow today with times and inventory.
  • Cycle Time Time to finish one unit at a machine or station, measured from the start of one unit to the start of the next, and compared with takt time.
  • Daily Management Shift routine of visual boards, short tiered meetings, leader checks and action follow up that keeps work on plan and surfaces problems fast.
  • Eighth Waste Waste of not using people's skills, ideas and creativity, added by Western practitioners to Ohno's original seven wastes.
  • Electronic Kanban e-kanban Kanban whose replenishment signal is sent electronically by barcode or RFID scan instead of a physical card, common for distant suppliers.
  • Every Part Every Interval EPEI How often a process can cycle through every product variant given the time lost to changeovers, so a shorter interval means smaller batches.
  • External Setup Changeover work done while the machine is still running the previous job, such as staging the next die, which shortens idle time.
  • FIFO Lane: Lane or rack between two processes that holds a fixed number of items in first in, first out order and stops upstream work when full.
    FIFO Lane Lane or rack between two processes that holds a fixed number of items in first in, first out order and stops upstream work when full.
  • Fixed-Position Stop System Andon setup on moving lines where a cord pull stops the line only at the end of the work zone, giving the team leader time to fix it.
  • Flow Kaizen Improvement of material and information flow across a whole value stream, usually led by managers, as opposed to station level process kaizen.
  • Future State Map Value stream map showing how a process should work after improvements, usually 6 to 12 months out, which becomes the improvement plan.
  • Gemba Japanese for the real place, meaning wherever value is created, usually the shop floor, where lean managers go to see problems firsthand.
  • Gemba Walk Planned visit by leaders to where work happens to observe, ask questions and support problem solving, rather than to blame or give orders.
  • Genchi Genbutsu Toyota Way principle of going to see the actual thing at the actual place so decisions rest on direct observation, not secondhand data.
  • Group Leader GL Toyota style supervisor responsible for several team leaders and their teams, owning the section's safety, quality, output and cost.
  • Hanedashi: Device that automatically ejects a finished part from a machine at the end of its cycle, so the operator only loads the next part.
    Hanedashi Device that automatically ejects a finished part from a machine at the end of its cycle, so the operator only loads the next part.
  • Hansei Japanese for self reflection, the habit of honestly owning mistakes and identifying what to do better, even after a successful project.
  • Heijunka Leveling production volume and product mix evenly over time so upstream processes and suppliers see steady, predictable demand.
  • Heijunka Box Scheduling board with slots per product and time interval into which kanban are placed to release work in a smooth, leveled order.
  • Ho-Ren-So Japanese workplace rule of report, inform and consult, meaning staff keep bosses and colleagues updated and seek advice early.
  • Hoshin Kanri Strategy method that turns a company's few most important goals into aligned plans at every level, from executives to the shop floor.
  • Improvement Kata Four step routine of Toyota Kata that sets a direction, studies the current condition, sets the next target condition and experiments toward it.
  • Internal Setup Changeover work that can only be done while the machine is stopped, so every minute of it is lost production time.
  • Jidoka Toyota Production System pillar in which machines and people detect a problem and stop at once so a defect is never passed on.
  • Jishuken Hands on Toyota workshop in which managers or experts solve real shop floor problems themselves, often with suppliers, to build skill.
  • Job Breakdown Sheet JBS Training worksheet listing a job's important steps, the key points in each and the reasons, prepared before teaching the job.
  • Job Instruction JI Training Within Industry method that teaches supervisors to train a job in four steps, prepare, present, try out and follow up.
  • Job Methods JM Training Within Industry method that teaches supervisors to improve a job by questioning each detail to eliminate, combine, rearrange or simplify.
  • Job Relations JR Training Within Industry method that teaches supervisors a four step way to handle people problems and treat workers as individuals.
  • Just-in-Time JIT Toyota Production System pillar of making and delivering only what is needed, when it is needed, in the amount needed.
  • Kaikaku Japanese for radical reform, a breakthrough change such as relaying out a whole plant, complementing small step kaizen.
  • Kaizen Japanese for change for the better, meaning continuous, small, low cost improvement by everyone as a daily habit.
  • Kaizen Burst Starburst symbol on a value stream map marking a specific improvement needed to reach the future state.
  • Kaizen Event Focused workshop of about three to five days in which a cross functional team redesigns one process on the shop floor and changes it at once.
  • Kaizen Promotion Office KPO Small central team of full time improvement specialists who coach managers, run kaizen events and track a lean transformation.
  • Kamishibai Audit system using a board of cards, each a check to perform, that leaders draw, verify and flip to green or red for all to see.
  • Kanban Japanese for signboard, a card or signal that authorizes making or moving a set quantity of parts, linking processes in a pull system.
  • Karakuri Kaizen Low cost improvement using simple mechanical devices driven by gravity, springs, levers and cams instead of motors and controls.
  • Lead Time Total time from request to delivery, such as from order to shipment, most of which parts usually spend waiting in queues.
  • Leader Standard Work Defined routines supervisors and managers follow at set times, such as floor walks, team meetings and standard checks, to sustain gains.
  • Lean Enterprise Institute LEI Nonprofit founded by James Womack in 1997 that publishes lean books, workbooks and training, including Learning to See and the Lean Lexicon.
  • Lean Manufacturing Production approach derived from the Toyota Production System that delivers customer value while removing waste through flow, pull and improvement.
  • Lean Product and Process Development LPPD Lean approach to designing products and their production processes, using a chief engineer, set based design and visual obeya planning.
  • Lean Thinking Five principles of value, value stream, flow, pull and perfection that turned the Toyota Production System into a general management approach.
  • Line Balancing Dividing line work among stations or operators so each carries about the same load, close to but not above takt time.
  • Mixed-Model Production Building different product versions on one line in a mixed sequence instead of large batches, matching output to the actual order mix.
  • Mizusumashi Material handler who runs a fixed timed route delivering parts to the line and collecting kanban and empties so operators stay at their stations.
  • Monozukuri Japanese for the art of making things, a word expressing pride in craftsmanship, deep process knowledge and constant refinement.
  • Muda Japanese for waste, meaning any activity that uses time, money or effort without adding value the customer will pay for.
  • Multi-Process Handling Staffing in which one operator runs several different processes in sequence while carrying a part through a cell.
  • Mura Japanese for unevenness, meaning swings in workload, volume or mix that overload people and machines at some times and idle them at others.
  • Muri Japanese for overburden, meaning pushing people or equipment beyond what they can reasonably handle, leading to injury, breakdowns and defects.
  • Nemawashi Practice of quietly talking a proposal through with everyone affected before a formal decision, so support is built in advance.
  • Non-Value-Added Activity NVA Any step that uses time or resources without changing the product in a way the customer pays for, such as moving, waiting or inspecting.
  • Obeya Japanese for big room, a dedicated project room whose walls show schedules, metrics, problems and designs so a team sees status at once.
  • Ohno Circle Teaching exercise in which a manager stands inside a circle drawn on the floor and watches a process until they see the waste for themselves.
  • One-Touch Exchange of Die OTED Extension of SMED that aims to finish a changeover in under one minute, ideally with a single action such as one turn or push.
  • Pacemaker Process Single point in a value stream that receives the customer schedule and sets the pace for all upstream and downstream processes.
  • Pitch Time needed to make one standard container of product, takt time times pack quantity, used as the interval for releasing work and checking progress.
  • Plan-Do-Check-Act PDCA Four step improvement cycle of plan a change, try it small, check results against expectations, and adopt or adjust it.
  • Point of Use Storage POUS Keeping parts, tools and materials right where they are used instead of a central storeroom, cutting walking and searching.
  • Poka-Yoke Japanese for mistake proofing, a device or design feature that makes an error impossible or obvious the moment it happens.
  • Practical Problem Solving PPS Toyota's structured method that narrows a vague problem to its point of cause by going to see, then uses why analysis to find the root cause.
  • Process Capacity Sheet Standard form recording manual, machine and tool change time for each machine to find the process's maximum output and its bottleneck.
  • Product Family Matrix Table of products against process steps that groups products sharing most steps into families for value stream mapping.
  • Production Kanban Kanban card or signal that tells a process to make a specific quantity of a specific part after the downstream process uses it.
  • Production Preparation Process 3P Method in which a cross functional team sketches and mocks up several alternative production processes before buying equipment.
  • Pull System Production control in which nothing is made until the next process or customer uses something and signals a need.
  • Push System Production control in which work is released by forecast or schedule whether or not the next process is ready, which tends to build inventory.
  • Red Tag Tag placed during the 5S sort step on any item of doubtful need, which is moved to a holding area and later kept, moved or discarded.
  • Respect for People Toyota Way pillar holding that employees should be developed, trusted and involved in solving problems rather than treated as labor.
  • Sensei Japanese for teacher, an experienced lean practitioner who coaches others, often by asking questions on the shop floor instead of giving answers.
  • Sequential Pull System Pull system in which processes build items one by one in the exact order of a schedule sent to the line start, rather than refilling a store.
  • Set-Based Concurrent Engineering SBCE Development approach that keeps several design options open and narrows them as evidence grows instead of committing early to one design.
  • Seven Wastes Taiichi Ohno's seven kinds of production waste, overproduction, waiting, transport, overprocessing, inventory, motion and defects.
  • Shadow Board Tool board marked with the outline of each tool in its place, so a missing tool is noticed at a glance.
  • Shigeo Shingo Japanese industrial engineer (1909 to 1990) who worked with Toyota and developed the SMED quick changeover and poka yoke methods.
  • Shingo Prize Operational excellence award named after Shigeo Shingo and run by the Shingo Institute at Utah State University since 1988.
  • Shojinka Flexible staffing that changes the number of operators on a line to match demand while keeping productivity high.
  • Shoninka Reducing the number of operators a process needs through improvement, with freed people redeployed rather than laid off.
  • Signal Kanban Kanban for batch processes such as stamping, placed at a set point in a container stack so reaching it triggers a full batch.
  • Single-Minute Exchange of Die SMED Shigeo Shingo's method for cutting machine changeover time to under ten minutes, enabling smaller batches, less inventory and shorter lead time.
  • Skills Matrix Grid of team members against tasks showing each person's skill level, used to plan job cover and training.
  • Spaghetti Diagram Overhead drawing of a work area tracing the path of a person, part or document, revealing wasted walking and transport.
  • Standard Work Written current best way to do a job, with step order, timing and parts on hand, forming the basis for training and improvement.
  • Standard Work in Process SWIP Smallest number of parts that must be inside a process, including in machines, for an operator to follow standard work without waiting.
  • Standardize-Do-Check-Act SDCA Cycle for holding a process at its current standard, follow it, check results and correct slippage, in contrast to PDCA for improving it.
  • Standardized Work Chart One page overhead drawing of a workstation showing the operator's path, work order, standard stock and checkpoints, posted for training and audits.
  • Standardized Work Combination Table Chart plotting one operator's manual, walking and machine automatic times against takt to show whether the work fits and where waits occur.
  • Start-of-Shift Meeting Short stand up meeting at each shift start where a team reviews safety, results, quality alerts, staffing and the day's plan at its board.
  • Stop-Call-Wait Operator rule to stop work, call for help, usually with the andon, and wait for the team leader instead of fixing it alone or passing it on.
  • Supermarket Controlled store between two processes holding a fixed amount of each part, refilled by the upstream process only as parts are taken.
  • Supplier Kanban Kanban between a plant and an outside supplier authorizing delivery of a set quantity on a set schedule based on actual use.
  • Taiichi Ohno Toyota engineer and executive (1912 to 1990) regarded as the chief architect of the Toyota Production System and the kanban system.
  • Takt Time Pace at which products must be finished to meet customer demand, available working time divided by units required.
  • Takumi Japanese for master craftsman, a title for highly skilled veteran workers at firms such as Toyota and Nissan who train others and check processes.
  • Target Condition Toyota Kata description of how a process should operate and what results it should achieve by a set future date.
  • Team Leader TL Hourly worker in a Toyota style plant who leads about four to eight operators, answers andon calls, covers absences and leads daily improvement.
  • Teian Japanese word for suggestion, used for employee systems in which frontline workers submit and carry out many small improvement ideas.
  • Three Actuals Japanese principle of sangen shugi, go to the actual place, see the actual thing and understand the actual facts before deciding.
  • Toyota Business Practices TBP Toyota's standard eight step problem solving method, from clarifying the problem to standardizing successful countermeasures.
  • Toyota Kata Management approach that builds problem solving habits through short repeated routines, described by Mike Rother in his 2009 book.
  • Toyota Production System TPS Toyota's manufacturing system for making exactly what customers need with minimal waste, built on just in time and jidoka.
  • Toyota Way Toyota's formal management philosophy, built on the two pillars of continuous improvement and respect for people.
  • TPS House Diagram of a house showing how the Toyota Production System fits together, with pillars of just in time and jidoka on a base of stability.
  • Training Within Industry TWI World War Two US government program that trained supervisors in job instruction, job methods and job relations, later adopted in Japan.
  • Two-Bin System Stocking method with two containers per part at the point of use, where the empty first bin becomes the reorder signal.
  • U-Shaped Cell Cell layout with machines in a U so the process start and end sit close together, cutting walking and easing staffing changes.
  • Value Stream All the steps, value adding or not, needed to take a product from raw material or concept to the customer.
  • Value Stream Mapping VSM Method of drawing on one page how material and information flow through every step from supplier to customer, then designing a better flow.
  • Value-Added Activity Any step that changes the product in a way the customer will pay for and is done right the first time, such as machining or assembly.
  • Visual Management Designing a workplace so anyone can see at a glance what is normal and whether something is wrong, using boards, markings and signals.
  • Waste Walk Walk through a work area specifically to spot and record waste such as waiting, extra motion, transport and excess inventory.
  • Withdrawal Kanban Kanban card authorizing a material handler to move a set quantity of parts from a supplying process or store to the process using them.
  • Work Element Smallest piece of work that can be moved to another operator or station, timed individually for line balancing.
  • World Class Manufacturing WCM Structured improvement system developed with Hajime Yamashina that combines TPM, TQC and JIT into audited pillars, used across Stellantis.
  • X-Matrix One page hoshin kanri chart linking breakthrough goals, annual goals, top projects, metrics and owners through grids around a central X.
  • Yamazumi Chart Stacked bar chart of each operator's or station's work against a takt time line, showing which are overloaded and which have spare time.
  • Yokoten Japanese for horizontal deployment, spreading a proven improvement or lesson across other lines, plants or departments to be adapted.

Full entry for members

Every term has a full entry for members: the plain-words definition, the practitioner note and the typed links between terms.

See membership

ACW Manufacturing Glossary, edition 2026.11.1. The headword and one line are open to everyone.