AutomotiveCloudWatch

Glossary · Manufacturing

Engineering Change Order

Approved authorization to carry out an engineering change, listing affected parts, documents and BOMs and the effective point.
Abbreviation
ECO

How it connects

Full entry

Every term has a full entry for members: the plain-words definition, the practitioner note, the standards and the organizations behind it. Visitors without a membership can open five full entries in any 30 days.

See membership

ACW Manufacturing Glossary, edition 2026.11.1. The headword and one line are open to everyone.