Glossary · Manufacturing
Greenfield
Brand-new factory or line designed from scratch, so its networks and data standards can be specified before construction.
How it connects
Often confused with
Full entry
Every term has a full entry for members: the plain-words definition, the practitioner note, the standards and the organizations behind it. Visitors without a membership can open five full entries in any 30 days.
ACW Manufacturing Glossary, edition 2026.11.1. The headword and one line are open to everyone.