AutomotiveCloudWatch

Glossary · Manufacturing

Loop Check

Commissioning step confirming each signal travels correctly from field device through wiring and I/O to controller and screen.
Also called
I/O Checkout, Point-to-Point Check

How it connects

Part of

Standards and regulations

Full entry

Every term has a full entry for members: the plain-words definition, the practitioner note, the standards and the organizations behind it. Visitors without a membership can open five full entries in any 30 days.

See membership

ACW Manufacturing Glossary, edition 2026.11.1. The headword and one line are open to everyone.