Glossary · Manufacturing
Loop Check
Commissioning step confirming each signal travels correctly from field device through wiring and I/O to controller and screen.
How it connects
Part of
Standards and regulations
- HART Highway Addressable Remote Transducer Protocol
Full entry
Every term has a full entry for members: the plain-words definition, the practitioner note, the standards and the organizations behind it. Visitors without a membership can open five full entries in any 30 days.
ACW Manufacturing Glossary, edition 2026.11.1. The headword and one line are open to everyone.