  • Absenteeism Rate Share of scheduled work time lost when employees fail to show up, which sets how many relief operators a line needs.
  • Absorption Costing Costing method that loads all manufacturing costs, fixed and variable, onto units made, as required for published financial statements.
  • Activity-Based Costing ABC Costing method that assigns indirect costs to products by the activities they actually cause, such as setups and inspections.
  • Amoeba Management Kyocera management system that splits a company into small profit units whose teams track and improve their own results daily.
  • Availability Share of planned production time a machine actually runs, one of the three OEE factors.
  • Bekidoritsu Toyota measure of how reliably a machine runs properly whenever it is called on, with a target of 100 percent.
  • Bottleneck Process step with the least capacity relative to demand, which limits what the whole system can produce.
  • Break-Even Point Volume at which revenue exactly covers all costs, so a plant or program makes neither profit nor loss.
  • Build to Schedule BTS Automotive measure of how closely a plant built planned vehicles in the right volume, mix and sequence.
  • Capacity Most a machine, line or plant can produce in a period, the ceiling for production, staffing and investment plans.
  • Capacity Utilization Actual output divided by capacity, closely watched in autos because underused plants spread fixed costs over fewer vehicles.
  • Capital Expenditure CapEx Spending on long-lasting assets such as buildings, lines and tooling, recorded as assets and depreciated over their use.
  • Cash-to-Cash Cycle Time Days between paying suppliers and collecting from customers, showing how much cash operations tie up.
  • Changeover Switching a machine or line from one product to another, such as changing press dies, measured from last good part to first good part.
  • Contribution Margin Sales revenue minus the costs that vary with each unit, the amount left to cover fixed costs and profit.
  • Conversion Cost Cost of turning raw materials into finished goods, meaning labor plus factory overhead but not materials.
  • Cost Kaizen Ongoing cost reduction for products already in production, driven by regular targets met through small improvements.
  • Cost Maintenance Keeping production costs at planned standard levels by budgeting and acting quickly on variances, as practiced at Toyota.
  • Cost of Goods Sold COGS Direct cost of the products sold in a period, including materials, labor and factory overhead, subtracted from sales for gross profit.
  • Cost per Unit CPU Total manufacturing cost divided by good units produced, the main cost number on shop floor boards.
  • Days Away, Restricted or Transferred Rate DART US safety rate counting serious injuries causing missed work, restricted duty or job transfer per 200,000 hours worked.
  • Days of Supply How many days current inventory would last at expected usage, also used for dealer stock of unsold vehicles.
  • Direct Labor Work of people who physically make or assemble the product, with time traceable to specific products.
  • Direct Run Rate DRR Percentage of vehicles or assemblies passing the line and final inspection without any repair or rework.
  • Dock-to-Dock Time Time from unloading raw material at receiving until the finished product ships, driven mainly by waiting inventory.
  • Downtime Time a machine or line should be producing but is not, from breakdowns, changeovers, missing parts or quality stops.
  • Drum-Buffer-Rope DBR Theory of Constraints scheduling where the bottleneck sets the pace, a buffer protects it and a release signal limits WIP.
  • Five Focusing Steps Theory of Constraints cycle to identify, exploit, subordinate to and elevate the bottleneck, then repeat.
  • Heinrich's Law Idea that each serious injury is preceded by many minor injuries and many more no-injury incidents.
  • Hierarchy of Controls Ranked order of hazard controls from elimination and substitution through engineering and administrative controls to PPE.
  • Hourly Production Board Board at a line or cell recording planned versus actual output every hour with the reason for any gap.
  • Hours per Vehicle HPV Total labor hours needed to build one vehicle in a plant, a common way to compare car plant productivity.
  • Ideal Cycle Time Fastest time a machine can make one part under perfect conditions, the reference speed for OEE performance.
  • Indirect Labor Work of employees who support production without working on the product, such as material handlers and supervisors.
  • Industrial Engineering IE Engineering discipline that designs efficient ways for people, materials, machines and information to work together.
  • Installed Capacity Yearly output a plant could produce with its existing equipment on its standard shift pattern.
  • JIS Z 8141 Japanese Industrial Standard defining production management vocabulary, from planning and process control to maintenance.
  • Jobs per Hour JPH Production rate of a car assembly line in vehicles completed per hour, the inverse of takt.
  • Kadoritsu Toyota measure of how much a machine is used versus its full-time capacity, allowed to vary with customer demand.
  • Key Performance Indicator KPI Number used to track progress toward an important goal, such as injuries per month or defects per million.
  • Kiken Yochi Training KYT Japanese team practice of predicting job hazards, agreeing precautions and confirming them by pointing and calling.
  • Labor Efficiency Standard hours earned for the output produced divided by hours actually worked, above 100 percent meaning faster than standard.
  • Labor Productivity Output per hour of work, such as units per labor hour, compared across plants and companies.
  • Leading Indicator Measure that signals future results early enough to act, such as near miss reports, unlike lagging results like injuries.
  • Lean Accounting Cost and performance measurement suited to lean, grouping costs by value stream with simple weekly reports.
  • Line Balance Efficiency How evenly work is spread across line stations, total work content divided by stations times cycle time.
  • Line Stop Halt of a production line from an andon pull, machine failure, missing part or quality problem.
  • Little's Law Rule that average work in process equals output rate times average time in the process.
  • Lost Time Injury Frequency Rate LTIFR Number of injuries causing at least one missed workday, scaled per million hours worked in most countries.
  • Man-Hour Unit of work equal to one person working one hour, used to estimate, price and measure labor.
  • Manufacturing Overhead All factory costs other than materials and direct labor, such as supervision, depreciation and utilities.
  • Mean Time Between Failures MTBF Average running time between breakdowns for repairable equipment, total operating time divided by number of failures.
  • Mean Time to Failure MTTF Average running time until failure for items that are replaced rather than repaired, such as bearings.
  • Mean Time to Repair MTTR Average time to get a failed machine running again, including diagnosis, parts and the repair itself.
  • Methods-Time Measurement MTM Predetermined motion time system that assigns standard times to basic human movements to set work standards without a stopwatch.
  • Minor Stops Short stoppages, often under five minutes, from jams or misfeeds that operators clear quickly but rarely record.
  • Motion Study Detailed study of the hand and body movements in a task to remove unnecessary motions and make work easier.
  • Near Miss Unplanned event that could have caused injury or damage but did not, reported as an early warning of hazards.
  • On-Time Delivery OTD Percentage of shipments or orders arriving by the promised date, a basic measure of supplier reliability.
  • On-Time In-Full OTIF Percentage of orders delivered on the promised date and in the full quantity ordered.
  • Operational Excellence OpEx Ability to run operations consistently well on safety, quality, delivery and cost through continuous improvement.
  • Overall Equipment Effectiveness OEE Single percentage, availability times performance times quality, showing how well planned time becomes good parts.
  • Overall Labor Effectiveness OLE Applying the OEE structure of availability, performance and quality to people instead of machines.
  • Overtime Hours worked beyond the normal shift, the quickest way to add capacity but costlier and tiring if overused.
  • Performance Board Visual team board showing safety, quality, delivery and cost results against targets with open actions and owners.
  • Performance Rate OEE factor comparing actual output with what a machine could make at ideal speed during its run time.
  • Personal, Fatigue and Delay Allowance PF&D Extra time added to a task's normal time when setting a standard, to cover personal needs, fatigue and delays.
  • Planned Cycle Time Cycle time a line is designed to run at, set slightly faster than takt to absorb expected losses.
  • Planned Production Time Time a machine or line is scheduled to produce, shift time minus planned breaks, the base for OEE.
  • Predetermined Motion Time System PMTS Setting standard times by adding published time values for basic motions without stopwatch timing.
  • Process Analysis Breaking a process into operations, moves, inspections, waits and storage on a chart to expose wasted time.
  • Process Cycle Efficiency PCE Share of total lead time spent actually adding value, usually calculated from a value stream map.
  • Production Management Planning, organizing and controlling people, machines, materials and methods to make the right products on time and cost.
  • Quality Rate OEE factor showing the share of parts produced that were good, counting scrap, rework and startup rejects as loss.
  • Ramp-Up Period after production starts when output rises from low volume to full rate while processes and supply stabilize.
  • Relief Operator Multi-skilled worker who covers line stations during breaks, absences and problem calls so the line stays staffed.
  • Rendanheyi Haier management model that splits the company into thousands of small self-managing microenterprises serving their own users.
  • Schedule Adherence How closely production follows the plan in volume, mix and sequence, with overbuilds not offsetting shortfalls.
  • Seru Production Japanese assembly approach where small teams or one worker build a whole product at a compact cell instead of a long line.
  • Shift Handover Structured passing of output, safety, quality, equipment and open action information from one shift to the next.
  • Shift Pattern How a plant arranges its working shifts and days, which sets its available hours, capacity and labor cost.
  • Six Big Losses TPM classification of six machine losses, breakdowns, setups, small stops, slow running, defects and startup losses.
  • SQDC Safety, quality, delivery and cost, the four standard headings on shop floor boards and in daily team meetings.
  • Standard Cost Predetermined cost to make one unit from expected material, labor and overhead rates, compared with actuals.
  • Standard Time Time a trained operator at normal pace needs for a task, including allowances for rest and delays.
  • Target Costing Setting a new product's maximum cost from the expected price minus required profit, then splitting it down to parts.
  • Technical Intern Training Program TITP Japanese program bringing workers from other Asian countries into Japanese firms, set to be replaced by a new system in 2027.
  • Theory of Constraints TOC Management approach that focuses improvement on the single constraint limiting a system, from Goldratt's The Goal.
  • Throughput Rate at which a system produces good output, such as vehicles per hour, limited by its slowest step.
  • Throughput Accounting Theory of Constraints accounting that judges decisions by money made through sales, favoring bottleneck output.
  • Throughput Time Total time one unit spends in a process from start to finish, including work, moves, inspection and waiting.
  • Tiered Meetings Short daily stand-up meetings held in sequence at each level from team to plant so problems escalate fast.
  • Time Study Directly timing a task over several repetitions to learn how long it takes and set a fair standard time.
  • Total Effective Equipment Performance TEEP Share of all calendar hours a machine turns into good output, OEE multiplied by loading.
  • Total Recordable Incident Rate TRIR Work injuries and illnesses needing more than first aid per 200,000 hours worked, a headline US safety number.
  • Units per Hour UPH Number of units a line or cell produces in an hour, a common rate target on electronics and assembly lines.
  • Uptime Share of scheduled time a machine or line is actually running, the opposite of downtime.
  • Utilization How much of its available time or capacity a resource is actually used, not always better when higher.
  • Value Analysis and Value Engineering VA/VE Methods for cutting cost while keeping required functions, applied in design (VE) or in production (VA).
  • Variable Costing Costing that includes only output-driven costs in product cost and treats fixed factory costs as period expenses.
  • Variance Analysis Comparing actual and standard costs and breaking the gap into causes such as material price or labor efficiency.
  • Work in Process WIP Materials and partly finished products in production but not yet finished, which lengthen lead time when excessive.
  • Work Sampling Statistical method that records what people or machines are doing at many random moments to see how time is spent.
  • Yield Share of good output compared with what went in, by units or material, a key number in many industries.

Full entry for members

Every term has a full entry for members: the plain-words definition, the practitioner note and the typed links between terms.