AutomotiveCloudWatch

Glossary · Manufacturing

Planned Production Time

Time a machine or line is scheduled to produce, shift time minus planned breaks, the base for OEE.

How it connects

Full entry

Every term has a full entry for members: the plain-words definition, the practitioner note, the standards and the organizations behind it. Visitors without a membership can open five full entries in any 30 days.

See membership

ACW Manufacturing Glossary, edition 2026.11.1. The headword and one line are open to everyone.