Glossary · Manufacturing
Permit to Work
Formal written system that lets hazardous work start only after hazards are assessed and controls are in place.
How it connects
Standards and regulations
- HSE HSG250 Guidance on permit-to-work systems
Full entry
Every term has a full entry for members: the plain-words definition, the practitioner note, the standards and the organizations behind it. Visitors without a membership can open five full entries in any 30 days.
ACW Manufacturing Glossary, edition 2026.11.1. The headword and one line are open to everyone.